KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  11-8-2021
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Footwell nutplates riveted

I riveted the nutplates for the rear part of the footwell flooring. Two on each side were kind of a pain because of the rudder cable standoff that has a nutplate and screw that was close to caused a little interferrence. The single lug nutplates made it easier for the outboard nutplates.

Better to catch that now than later.
' style=

Nutplates installed

Nutplates installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.