Date:  8-28-2021
Number of Hours:  9.10
Manual Reference:  
Brief Description:  ELT and Avionics wire harness

I decided to start this Category called Additional Help because it would help track the additional hours and assistance I have received on the project to give a bit more accurate total time that it took to complete the project. I should have done this sooner but I will try to eventually go back and capture all the extra hours. I will not capture hours with random sessions of folks assisting but when folks like Ralph, Rob, and Rick assisted I will go and capture those project hours.

Anyway Ralph and I worked on the ELT and got that knocked out as documented in the previous log. Then Ralph continued sorting through the wiring. He separated the power wires to the prospective CBs or Fuse Block. Then he sorted the ground wires into a bundle. You can see the two red wire trunks on the right and left sides of pic 2 and the ground wire bundle on the right side of pic 3.

I assisted Ralph with installing nylon ties in places where we needed support for the wire. In between I was working on the conduit, lacing wires and pulling wires through conduit.

Ralph also was drawing things on a notepad in electrical hieroglyphics symbology....it was a full day and Ralph is the best avionics source in this build!!!
' style=

Rob & Ralph busy at work

Rob & Ralph busy at work

' style=

Ralph is doing harness miracles

Ralph is doing harness miracles

' style=

Ground wires sorted

Ground wires sorted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.