KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  8-12-2021
Number of Hours:  2.20
Manual Reference:  
Brief Description:  GIB LEMO Routing

I continued to tackle the GIB LEMO wire routing. I decided to remove one conduit from the spar gap area in order to put a larger snap bushing for the bundle to pass through. It included opening up four holes to get the LEMO bundle to it's final location. I had to remove some wires the smaller snap bushings to drill everything out for the larger bushings.

I sat in the cockpit area for a while looking for alternate routing methods but in the end the course I chose seemed to be the most logical. Anyway with that bundle in it's location I can complete the remaining hole for the music jack and hook up the lemo.
' style=

Conduit removed

Conduit removed

' style=

LEMO Wire in place

LEMO Wire in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.