KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  6-4-2021
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Antenna Doubler and housekeeping

A little shop work and a lot of housekeeping today. I had one more thing to do on the ILS antenna doubler install which was to enlarge the clearance hole for the BNC antenna wire connection. I drilled it to the 5/8 hole size and deburred it. The clearance hole will allow me to remove the antenna and get the BNC connector out through the hole without having to reach into the fuselage to disconnect it first.

I received a bunch of FWF type parts that I ordered from the parts list and will have to order other parts. I didn't order the entire FWF kit. A number of parts are also backordered.

I got the snorkle, sensor manifold and misc other things and unpacked them. The rest of the time was given to trying to declutter the workshop.
' style=

BNC antenna hole enlarged

BNC antenna hole enlarged

' style=

Vans Parts - Baffle material

Vans Parts - Baffle material

' style=

Induction Snorkle

Induction Snorkle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.