KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  2-8-2021
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Fuse Bay Bus Wires

Decided to work on the Fuse Bay Bus Feeds tonight. I gathered all the tools and climbed into the fuselage to get the work done.

I wanted to leave some extra wire for "in case' I needed it in the future so I tried several routing paths for the wires. I finally settled on running the wire down the gear tower and placing another small nylon tie to secure it. I slid the labels on the wires prior to putting the terminals on the ends...its a small detail that if you forget once...you probably won't forget again. I got the terminals installed and spent some time making sure the wire would not be jammed and chafing on anything.

One thing I learned working with aircraft quality tefzel wire....it is not very flexible (like that used in cars) but even the smaller diameters are very stiff. By the time I finished with the fuse bay bus wires another three plus hours passed!
' style=

Fuse Bay Bus Feeds

Fuse Bay Bus Feeds

' style=

Getting it all connected

Getting it all connected

' style=

Fuse block with 24 fuse capacity

Fuse block with 24 fuse capacity

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.