KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  2-2-2021
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Complete Wire Tie Panel

Went to the shop to get a little time in on the build. I gathered the nylon wire ties and attached them to the new wire tie panel.

Next I put a piece of my foam rubber seal material on the front back of the panel in order to keep stuff from getting behind the gap between the tie panel and the baggage panel.

I installed the battery tray bolts to the wire tie panel and then attached the upper panel with the #8 screws.

I put the battery (not a real battery...just the case I conned from the Concorde rep at SnF booth). The new ver 2.0 panel has increased the space between battery and tie panel.

One more item completed in the build process.
' style=

Wire tie panel completed and installed

Wire tie panel completed and installed

' style=

More room between battery with ver 2.0

More room between battery with ver 2.0

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.