KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  1-19-2021
Number of Hours:  1.60
Manual Reference:  
Brief Description:  Conduits

I trimmed the three conduits that I installed in the fuse yesterday for wiring. Next I located and drilled the adel clamp for the large conduit where I am planning to route the majority of ground wires that will go to the firewall forest of tabs.
' style=

Ground wire conduit

Ground wire conduit

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.