KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  1-10-2021
Number of Hours:  5.30
Manual Reference:  
Brief Description:  CB Panel (continued)

I continued working on the bus bars again today. Measuring, cutting, drilling and bending. The Avionics Bus has a 5 AMP breaker on the row below it so I tied in a 14 AWG wire to connect it to the avionics bus.

The bottom three rows are part of the Master Bus #2 so I was able to use copper bus bar to tie them all together which worked nicely. CB board is ready to be installed and bus wired to be connected.
' style=

CB Panel Buss Bars

CB Panel Buss Bars

' style=

CB Panel Buss Bars 2

CB Panel Buss Bars 2

' style=

CB Panel Buss Bars 3

CB Panel Buss Bars 3

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.