KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  11-12-2020
Number of Hours:  0.00
Manual Reference:  
Brief Description:  House Flooring Project

Time to get caught up on the log. We do have some diversion coming in the form of redoing the house flooring. It has needed attention for quite some time. After selecting and purchacing the flooring the time came for the installation.

Being the way I am I decided to pull out all the carpeting myself and haul it to the dump. I then bought a bunch of decking screws at Lowes and proceeded to screw down the seams of the floor to erradicate all squeaks as well as the possibility of future squeaks....about 1500 screws later I had the job completed.

Anyway.....life events that divert from the build process.
' style=

Major Flooring Project

Major Flooring Project

' style=

Office

Office

' style=

Hall

Hall

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.