KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  10-13-2020
Number of Hours:  0.50
Manual Reference:  
Brief Description:  GEA 24 and GAD 29 holes

Just had a few minutes tonight to sneak down and drill the holes in the GTN brackets for the last four holes needed to be drilled in the brackets for the GEA24 and GAD29 modules.
' style=

Remaining holes drilled

Remaining holes drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.