KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  10-11-2020
Number of Hours:  2.50
Manual Reference:  
Brief Description:  GTX 45 Brackets (cont)

Last session pushed me over the 1900 HOUR mark......and still moving on in hopes to get this project completed prior to the turn of the century!

Anyway, I continued on the GTX 45 brackets for the tray to be held in place. I got the forward angles drilled and nutplates installed and then match drilled to the airframe.

I then began to design the right hand rear bracket for that corner. I decided to only use one #8 screw to secure that support. I drilled and installed the nutplate then drilled the holes into the airframe and match drilled them to the support.

One more bracket to go for the left rear portion of the tray.
' style=

Forward Brackets drilled

Forward Brackets drilled

' style=

Front rear bracket

Front rear bracket

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.