KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  6-24-2020
Number of Hours:  2.20
Manual Reference:  
Brief Description:  Wire Pitot tube connector

I wired the connector for the pitot tube heat. I am using printed paper labels and clear shrink wrap to hold the labels. These are pretty much the first wires I have connected on the project.

I am trying to leave service loops in case wires have to be repaired in the future so that is one concern I wanted to address. The next is keeping wires secure and protected so they don't rub or fray and get shorted, so I used some spiral wrap, shrink wrap, and zip tie anchors to secure the bundle.
' style=

Connector wired

Connector wired

' style=

Connector wired

Connector wired

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.