KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  5-18-2019
Number of Hours:  3.60
Manual Reference:  
Brief Description:  Forward Baggage Door #6

I spent this session getting the setting up and drilling the F-873G Rib, F-873H spacer, and F-873J hinge set in place and ready to drill. Next I drilled the holes using the skin pre-punched holes as a guide.

After drilling I laid the door on the skin. I had to trim about 1/8 inch off the door edge where the other half of the hinge goes in order to have the spacing required on the print.
' style=

Setting hinge

Setting hinge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.