Powered By Kitlog Pro v2.0
Bob's RV-8 Build Site
RV-8
All
6-20-2014
< Previous Log Entry
Next Log Entry >
Date:
6-20-2014
Number of Hours:
1.30
Manual Reference:
Brief Description:
Conduits
Finished installing adel clamps in baggage area on conduits. Installed two strings in each conduit to pull wires at a later date.
Adel clamps in baggage area
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
861
1908
Avionics
34
104
Canopy
102
245
Electrical
51
147
Empennage
111
282
Engine
15
35
Fiberglass
23
56
Fuselage
375
854
Life Events
29
Lighting
6
7
Misc.
35
16
None
1
Paint
9
29
Prop
1
Rework Items
55
101
Wings
14
32
Copyright © 2001-2020 Matronics. All Rights Reserved.