KitLog pro

Powered By Kitlog Pro v2.0

Steve & Nancy Riffe
' style=
Date:  11-11-2012
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Panel Design-3

More panel planning and looking at wiring runs tonight. I re-arranged some of the backup instruments on the panel—they look better in this position. However, this may not be the ideal location in the event of actually relying on them if the Dynon dies while IMC. I need to install the front seat and study this a bit further. I also installed some grommet edging in the top hole of each of the gear towers. This will ensure a smooth edge where wiring exits the top of the towers.
' style=

More panel design

More panel design

' style=

Grommet edging-top of gear tower

Grommet edging-top of gear tower

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.