KitLog pro

Powered By Kitlog Pro v2.0

Steve & Nancy Riffe
' style=
Date:  3-18-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Fuel line, battery cable

Installed 4 adel clamps that secure the fuel line from the right side to the fuel valve. Installed the rubber grommets where the fuel lines pass thru the fuselage to the left & right fuel tanks. Began planning for install of battery cable-battery mounted in rear of fuse. Drilled a couple of holes thru bulkheads and installed snap bushings. Fed the #2 cable from the rear up to the area of the aileron trim bracket. Van’s doesn’t provide much detail regarding wire runs, so much is left up to the builder. That #2 cable is about as flexible as a 2x4!
' style=

Pic showing drilling for rivnut install

Pic showing drilling for rivnut install

' style=

Adel clamps securing fuel line

Adel clamps securing fuel line

' style=

Started battery cable run

Started battery cable run

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.