Cleaned up the shop a bit and didn’t really have anything planned, so decided to drive a few rivets. The rivet holes calling out to be filled were along the side skins where the canopy rails will eventually rest. Drove 9 rivets, then stopped to drill out to 2 pop rivets installed by the QB guys—then drove those 2 rivets.