KitLog pro

Powered By Kitlog Pro v2.0

Steve & Nancy Riffe
' style=
Date:  8-20-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  F839, F840, F841 Control Tubes-Finish

Poured primer into the F840 tube and slowly tilted the tube back and forth. After about 10 minutes of this, I poured the primer into the F841 tube. Then I added a bit more primer and went thru the same routine as the F840 tube. Emptied the primer into a can and removed the tape left the primer to dry. Later in the day, I checked and the primer was dry—Texas heat tends to dry primer rather quickly. I dipped the end caps in primer and shoved them into the tubes. Then I dipped the pop rivets in primer and pulled them with the hydraulic riveter. I cleaned and scuffed the outside of both tubes and shot them with primer. Adjusted the length of F839 tube per plan specs. Done with the three control tubes.
' style=

F840 tube primed

F840 tube primed

' style=

F841 tube primed

F841 tube primed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.