Brief Description: Installed floors & seat backs (just for grins)
Not any real work tonight-at least none logged. Waiting on some aluminum sheet (delivery tomorrow) and on a latch for the battery hinge (delivery next week). I want to finish the battery hatch and the c/b panel before moving to mount the fuel valve. So, I installed all of the floor boards. Was tired of moving them every time I rotated the fuse. Note: builder‘s manual says when ready for final installation of left (F830) & right (F831) seat floors, should install floors, then rivet on the six F830c stiffeners under the seat floors. I suppose this is for ease of installation of the floors. However, I had previously riveted the stiffeners on and found that installing the seat floors was not an issue. Next up-fab c/b panel.