KitLog pro

Powered By Kitlog Pro v2.0

Steve & Nancy Riffe
' style=
Date:  3-2-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  L. float arm, part 1

Whoo Hoo-UPS brought care packages today. Received senders, parts to fab the inspection hole for the stall warner and proseal from Van’s today. Also received a tube of fuel lube and some Boelube from Spruce. Started in on the fuel sender for the left tank. Checked the ohm resistance of both senders and found them within specs. Bent the float arm per the plans for the left tank. Interesting to note that the dimensions of the float arm length are different on each wing.
' style=

Checked resistance of senders

Checked resistance of senders

' style=

First bend on left float arm

First bend on left float arm

' style=

Left float arm done!

Left float arm done!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.