Powered By Kitlog Pro v2.0
Sonnys Web Site
RV-10
SEC 10 TAILCONE
10-20-2008
< Previous Log Entry
Next Log Entry >
Date:
10-20-2008
Number of Hours:
7.50
Manual Reference:
SEC 10
Brief Description:
Tie down bar & Bulk head Frames
1. Make the F-1010E Tie Down Bar from the length of AEX TIE DOWN X 7.5000 provided in the kit. Trim to size, then tap shown in Figure 1
2. F-10006A, B, C, and D Bulkheads Frames completed along with Service Bulletin 08-6-1 complied with.
3. Ready to cleco in the F-10006A, B, C, and D Bulkheads
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
23
305
Horizontal Stabilize
2
54
Miscellaneous
2
Partners
2
SEC 10 TAILCONE
4
78
SEC 6 VERTICAL STABI
2
29
SEC 7 RUDDER
3
90
SEC 8 HORIZONTAL STA
2
54
Technique
2
Tools
2
Tools 1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.