RV12
Fuselage
3-19-2012
< Previous Log Entry
Next Log Entry >
Date:
3-19-2012
Number of Hours:
7.00
Manual Reference:
21
Brief Description:
Seat ramp floors
P 21-10, control coumn mount assy, countersinking on F1203A Bulkhead. Riveted bulkhead.
P 21-11, riveted bulkhead doublers and installed control column mounts.
P21-12, F1203J bulkhead doubler prep. Riveted nutplates to F1203A bulkhed.
21-13, step 3.Dimpled seat ramp floors, through to step 9.
Installed seat ramp floors and nutplates.
21-14 - installed control column. Riveted step ribs, clecoed F1202F bulkhead in place.
Installed snap bushings.
P21-14 completed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV12 Home
Category
# Logs
# Hours
All
136
631
Avionics
2
4
Empennage
25
80
Engine
1
6
Fuselage
66
287
Paint
4
23
Tail cone
12
44
Wings
26
187
Copyright © 2001-2024 Matronics. All Rights Reserved.