KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  4-6-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Wire Run in Aft Fuselage 2 - NOT

So here is how I ran the 7 wires aft. Is this right?
They are secure in the tie mounts.
I wrapped the red & black around each other to cancel the magnetic fields.
Should I use ties or string to connect the wires together more? Probably?
I put a little bushing into the bigger bushing to reduce size of the hole.

I'm going to get an inspector to come have a look.

Okay, I went and talked to our local AP AI and this is NOT okay. See next few entries. He said the wire does have to be supported, but better if not bent up and down at the hole thru the bulkheads. And it shouldn't lie on the aluminum bottom because it will rub chaff and corrode.
' style=

Ran wires on bottom

Ran wires on bottom

' style=

tie mount near pass thru bushing

tie mount near pass thru bushing

' style=

Double bushing to reduce hole size

Double bushing to reduce hole size

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.