KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  8-18-2010
Number of Hours:  0.30
Manual Reference:  
Brief Description:  Fitting Side Skirts 15: 3rd Set of side skins

So with new side skins down I assembled the canopy. I'm do last pickups before riveting together. One thing I can't figure out is what to do about these tabs on the fwd skin and the forward end of the side skins. I'll post on Vans Forum and see if I get any options from others.

I think the requirements are:

1) these pieces of skin need to be fastened down so they don't vibrate
2) need to be trimmed such that they can be smoothed and blended with fiberglass
' style=

Canopy frame almost ready to rivet

Canopy frame almost ready to rivet

' style=

What do do about this area

What do do about this area

' style=

Need some advice options

Need some advice options

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.