KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  7-13-2010
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Drilling the Canopy 5: Drill side rails

I'm ready to drill the frame. Plans give you an option of drilling either the frame or the canopy first. Seems a lot easier to mark holes on the frame.

So I measure and marked the hole locations on the side rails.

The forward hole is 5/16 from where the side skin and top skin interface. But the first hole is where the canopy is spread wide and I'm depating on using that hole. So I skipped it for now.

Aft hole measures from interface of side skin to the aft top skin side skirt.
' style=

5/16 from top

5/16 from top

' style=

2 5/16 from interface of skin

2 5/16 from interface of skin

' style=

Aft hole

Aft hole

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.