KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  7-1-2010
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Canopy Fitting 19: Prepare for Side Cut

I marked a line on the crease of the side rails where the canopy needs to be trimmed to.

I clamped the canopy on with lots of clamps and tape along the side to hold it in to the fuselage.

I marked the cut line on the canopy. Of course I rolled back the plastic so cut line is on the plastic.
' style=

Marked side rails

Marked side rails

' style=

Taped on the canopy

Taped on the canopy

' style=

Here is how inside tape worked

Here is how inside tape worked

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.