KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  6-7-2010
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Finishing The Frame 4

I never did figure out what Van's plan meant when it said, "clamp a piece of scrap angle along the bottom edge of the side of the frame to make sure it is straight." But I did drill the holes thru the bottom flange and wedges. I started with #40 and then enlarged to #30.

I machine countersunk all the holes with flush heads on the outside and bottom per drawing.
' style=

Drilling the bottom flange

Drilling the bottom flange

' style=

Enlarge holes to #30

Enlarge holes to #30

' style=

Countersink for flush rivets

Countersink for flush rivets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.