KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  1-20-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Attach HS to Fuselage 7: Drill Holes

I measured the forward aft position several ways and decided on a location slightle aft of the flange centerline. I drilled the holes first with 1/8 drilled and then using the angle drill I enlarged them while keeping them clamped.

The holes looked okay (at first). But on closer look that outside bolt looks like it might be too close the longeron edge. I'm sending some photos to Van's to see what they say.

More on that later . . .
' style=

Drilled first with 1/8 drill

Drilled first with 1/8 drill

' style=

Enlarged to #12 using angle drill

Enlarged to #12 using angle drill

' style=

At first these look okay

At first these look okay

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.