KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  1-6-2010
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Tubing: Brake Lines 4: Left tube routing

With the fittings in place it was time to man handle the tubing and make a run.

I used only the flexible springie thing over the tube for bending. I ran the tub thru bushings bending as I go. I started near the fuel valve and routed back towards the fitting to the wheels, then ran the line forward to the firewall.
' style=

Routed this back first

Routed this back first

' style=

Then routed forward to here

Then routed forward to here

' style=

Stayed forward of fuel line

Stayed forward of fuel line

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.