KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  1-3-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Tubing: Finish the Vent Lines (Final Install)

Okay the wing to body join is now over and I'm getting back to the plan. Last place I left off was with the tubing. I should start the brake lines, but before I do I've decided this tubing is going in for its final time. So I might as well make it right. I'm priming and tightening bolts and screws with the assumption that these won't be coming out again prior to first flight.

If my assumption changes and I do have to remove all this tubing before first flight I'll come back here and make a note.

I primed the vent lines. And I primed the fuselage around the penetration of the vent line to wing.

Then I installed the lines and screwed everything down. I also put Fuel Lube on the fittings assuming this is the last time I'll remove them. I hope this is true.
' style=

Primed vent lines

Primed vent lines

' style=

Primed fuselage side

Primed fuselage side

' style=

Installed assuming last time

Installed assuming last time

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.