KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  12-19-2009
Number of Hours:  0.20
Manual Reference:  
Brief Description:  Wing Root Fairing 4: Mark 3/16 clearance

I enlarged the holes to #19. I'll be dimpling and countersinking these holes for flush #8 screws.

The drawing says the gap in between the fairing and the fuselage needs to be a minimum of 3/16 and maximum of 1/4. This must be for the rubber stripping that will go in here later.

So I found a piece of 3/16 aluminum and used it as a spacer to mark the fairing 3/16 from the side of the fuselage.
' style=

All holes enlarged to #19

All holes enlarged to #19

' style=

Mimimum gap = 3/16

Mimimum gap = 3/16

' style=

Using spacer and marking fairing

Using spacer and marking fairing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.