KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  12-19-2009
Number of Hours:  0.20
Manual Reference:  
Brief Description:  Wing Root Fairing 2: Mark holes and drill

Before drilling the holes I marked them and lifted up the fairing to see where on the tank the holes would be. I didn't want any surprises. Turns out they are okay.

So I drilled initial holes with #40. These have to be enlarged to #19 for a #8 screw.
' style=

Marked hole locations for visibility

Marked hole locations for visibility

' style=

Locations are okay

Locations are okay

' style=

Initial match drill with 3/32 (#40)

Initial match drill with 3/32 (#40)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.