KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  12-5-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Landing Gear Weldmount Installation 5

I put all the bolts in and the screws. I used some long needle nose pliers to reach in and put on the washers and nuts. Not sure yet how I'm going to torque these nuts.

Although this shouldn't have taken a whole day, it did. I kept checking and screwing around with bolts, washers, dropping stuff, etc. During this work, I used my fuselage rotisserie by turning it from its side to up side down a few times.
' style=

Used pliers to put on nuts & washers

Used pliers to put on nuts & washers

' style=

Not sure how to torque these

Not sure how to torque these

' style=

All the bolts are in loose

All the bolts are in loose

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.