Powered By Kitlog Pro v2.0
RV-7A Construction Log
RV-7A
Fuselage After Flip
12-1-2009
< Previous Log Entry
Next Log Entry >
Date:
12-1-2009
Number of Hours:
0.10
Manual Reference:
Brief Description:
Flap Mechanism 9 Match drilling the doubler
Next the double plate for the actuator bolt gets match drilled to the brace. And the bolt hole gets enlarged to 1/4.
I used the 1/4 drill. I should have used the step drill because the step drill does a smoother job. The drill chattered in the hole.
Match drilling this doubler to brace
Match drilling the doubler
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
2101
1764
Avionics
60
53
Cert & Flying
62
75
Cowl
48
37
Electrical
61
48
Empennage
141
181
Engine
102
73
Finish Kit
255
148
Fuselage
339
238
Fuselage After Flip
385
237
Gear
78
57
Interior
16
14
Miscellaneous
49
33
Painting
62
50
Prop
17
17
Shop
5
10
Tools
59
24
Training Projects
12
32
Wings
350
437
Copyright © 2001-2024 Matronics. All Rights Reserved.