KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  11-9-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Tunnel Cover 2

The plans say the holes in the angle have to match with the floor "so measure carefully." Well bag that you can't measure that carefully so I removed the floors (after putting it all in) and used the holes to match drill the holes in the angle to ensure they fit together.

Then I used my cheap Harbor Freight Sheet bender and bent the cover up 1/4 inch per drawing.

I clecoed it all together and installed it on the floors, after putting the floors back in, and match drilled all the holes.
' style=

Remove floor and match drill

Remove floor and match drill

' style=

Bend 1/4 cover per drawing

Bend 1/4 cover per drawing

' style=

Clecoe it all together and drill

Clecoe it all together and drill

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.