KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  11-9-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Tunnel Cover 1

So with the seats done the plans say to clecoe in the floors and make the Tunnel Cover. Only a couple pieces of material are needed. The z-channel gets a couple cuts on the band saw and sanded smooth. There are a couple of 1/16 radius that I did not get made very well. I tried using a sanding drum but it was too large. I tried drilling a hole and that worked kind of.

But they are functional.
' style=

Clecoed all the floors in

Clecoed all the floors in

' style=

Found materials for Tunnel Cover

Found materials for Tunnel Cover

' style=

Cut the z-angles per drawing

Cut the z-angles per drawing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.