KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  10-23-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Cargo Fwd Side Walls

There wasn't much to do for the forward cargo side walls. I match drilled the holes, deburred primed and installed the platenuts. Then I decided I wouldn't be putting this on anytime soon so I painted it with my interior paint.

I'm using the Rustoleum Hammered Look, Lt. Grey. I like the finish.

I think all the covers and parts that are removable should get interior paint and set aside. So that is what I'll be doing from here forward.
' style=

Putting on the platenuts

Putting on the platenuts

' style=

Primed and painted

Primed and painted

' style=

close up of paint

close up of paint

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.