KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  10-16-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Rudder Cable Fairing 1

Before I left on business travel I had decided to screw on the rudder cable fairings. I'm using the fairings from Avery's Tools. I tried making about 3 of them, but didn't like the sharp bend. These cost only $12 bucks.

I decided platenuts and screws rather than rivets. And I decided #6 flush screws.

So I drilled the screw holes and then played around with platenuts to get them positioned without interference with each other. Then I drilled all the holes.

Yuk, lots of holes look bad.
' style=

Screw on these Avery fairings

Screw on these Avery fairings

' style=

Playing w/ platenut placement

Playing w/ platenut placement

' style=

Drilled all the holes

Drilled all the holes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.