KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  9-26-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Canopy Decks: Position and Drill

Then I positioned the forward canopy deck, the aft canopy deck and the 757 on the longerons. I measured and drilled all the holes per drawing.
' style=

F-757 getting positioned and drilled

F-757 getting positioned and drilled

' style=

Clecoed

Clecoed

' style=

Forward Canopy deck drilled

Forward Canopy deck drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.