KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  4-5-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Fuselage Finish: Dynon ADAHRS 3

Here is the ADAHRS bracket riveted in place. I used flush 3/32 rivets. I put the lip on the front with three bushings for the Pitot, Static, and AOA tubes to run thru and then they'll attach to the ADAHRS. I was able to get the dimensioned drawings off the Dynon website. These bushings will hold the tubes and keep stress off of the fittings so to minimize chance of leak from vibrations. I remeasured and it is flat in all directions with the longerons.
' style=

Riveted in

Riveted in

' style=

4 flush rivets along top edge

4 flush rivets along top edge

' style=

ready to accept ADAHRS

ready to accept ADAHRS

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.