Date:  4-5-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Fuselage Finish: Dynon ADAHRS 2

I clamped and drilled. I'm using 4 3/32 flush rivets per side. I'm making sure the bottom is flat and level with airframe. It is about in the center between the baggage bulkhead and the next one aft. Pitot/static will run in the front and electricity will run up to the back.

The forward flap will eventually get drilled for pitot/static line bushings.
' style=

Positioned bracket

Positioned bracket

' style=

Drilled ensuring level

Drilled ensuring level

' style=

Front will hold pitot/static

Front will hold pitot/static

' style=