KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  4-5-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Fuselage Finish: Dynon ADAHRS 1

Before I can finish the fuselage skins I need to mount a bracket for the eventual ADAHRS from Dynon. I got the drawing off their web site. I reviewed other builders brackets on Vans Forum and decided on this bracket.

First I made it out of paper. Then cut it out of .032 aluminum. I bent up the sides. I left a front on it which I will eventually drill for plastic busihngs for the pitot static lines to run thru so to relieve stress on the interface of the tubes with the Dynon ADAHRS.
' style=

First leveled the fuselage

First leveled the fuselage

' style=

Made paper template

Made paper template

' style=

Cut from .032 aluminum

Cut from .032 aluminum

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.