Powered By Kitlog Pro v2.0
RV-7A Construction Log
RV-7A
Fuselage After Flip
4-8-2010
< Previous Log Entry
Next Log Entry >
Date:
4-8-2010
Number of Hours:
0.20
Manual Reference:
Brief Description:
Fuselage Final Items: Fwd Elevator Push Rod 2
I cleaned and primed the fwd push rod.
I played around with how to install this and discovered you bring it in along side of the cargo bulkhead and with the bearings off.
I installed the sticks with a couple bolts and clamps.
Then I hooked up the pushrod and it worked fine with no interferences.
Primed the push rod
Installed the sticks
Installed the push rod from side
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
2101
1764
Avionics
60
53
Cert & Flying
62
75
Cowl
48
37
Electrical
61
48
Empennage
141
181
Engine
102
73
Finish Kit
255
148
Fuselage
339
238
Fuselage After Flip
385
237
Gear
78
57
Interior
16
14
Miscellaneous
49
33
Painting
62
50
Prop
17
17
Shop
5
10
Tools
59
24
Training Projects
12
32
Wings
350
437
Copyright © 2001-2024 Matronics. All Rights Reserved.