KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  4-2-2010
Number of Hours:  0.20
Manual Reference:  
Brief Description:  Fuselage Final Items: Air inlet scoops 4

I primed the square washers and the back side of the air inlets.

I ordered these flush pulled rivets. They are called CCR 264. Some call them platenut rivets. I used the -3 length and 3/32 diameter. I will eventually fill in the hole and they'll look like solid rivets.
' style=

Priming inlets and washers

Priming inlets and washers

' style=

Special #40 flush pulled rivets

Special #40 flush pulled rivets

' style=

CCR264CS-3-3 Platenut rivet

CCR264CS-3-3 Platenut rivet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.