KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  3-22-2010
Number of Hours:  0.20
Manual Reference:  
Brief Description:  Front Deck (Tip Up) 18: Install into fuselage

I installed the structure into the fuselage, starting with the outboard subpanel pieces followed by the center section. It went to gether fairly easy and the hole alignment is amazingly accurate.

Photo 3 below was taken after drilling the skin.
' style=

Install outboard subpanel 1st

Install outboard subpanel 1st

' style=

Clecoed in place

Clecoed in place

' style=

Structure ready for skin

Structure ready for skin

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.