Brief Description: Front Deck (Tip Up) 14: Seal Support Brackets
Before I rivet some platenuts on the aft flange of the forward fuselage ribs I decided to drill the seal brackets to the corner sub panels.
These are also set back 1/8 inch from top of flange for the weather stripping. So I clamped on a piece of scrape and drew a 1/8 setback line using a .125 spacer.
Then I clamped the seal supports and drilled them.