KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  3-20-2010
Number of Hours:  0.20
Manual Reference:  
Brief Description:  Front Deck (Tip Up) 12: Fwd Fuse Channels

Next I made the two fwd fuselage channels and drilled them in place. I cut this on the band saw and sanded them to final dimensions on the belt sander. Then I located them on the sub panel and drilled them with the long 1/8 drill bit.

These channels fit flush with top flange because the skin will get riveted to them.
' style=

Cut this in two

Cut this in two

' style=

Trim off the bottoms

Trim off the bottoms

' style=

Drill them in place w/ 1/8 long bit

Drill them in place w/ 1/8 long bit

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.