KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  3-19-2010
Number of Hours:  0.30
Manual Reference:  
Brief Description:  Front Deck (Tip Up) 10: Center Sub Channel

The channel is located on the drawings with one hole.

Thecenter sub channel also gets located and drilled at this point. So I clamped it in place and drilled it. Drawing shows that the flange on top needs to be in the same plate as the flange on the subpanel. So I clamped my ruler on the subpanel and positined the channel up against it.
' style=

Hat channel located by this hole

Hat channel located by this hole

' style=

Center sub channel located

Center sub channel located

' style=

. . . and drilled

. . . and drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.