KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  2-22-2010
Number of Hours:  0.10
Manual Reference:  
Brief Description:  Cabin Frame Roll Bar 33: Prime scratches

The roll bar frame is now all drilled and ready to come off. I still have to rivet it together the rest of the way with pulled rivets, but only after I mount the bracket angles at the top.

I used a little alcohol to wipe down where I had trimmed away material and drilled new holes. Then I shot the area with primer. The alcohol doesn't mess up the primer, and it does clean grease/oil off the aluminum for priming.
' style=

Roll bar installed

Roll bar installed

' style=

Cleaned area with alcohol

Cleaned area with alcohol

' style=

Primed

Primed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.