KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  2-16-2010
Number of Hours:  0.10
Manual Reference:  
Brief Description:  Cabin Frame Roll Bar 17: Drill overhead angle

Per some other construction sites, folks suggest drilling the two side angles to the aft channels so you can use solid rivets now rather than pulled rivets later.

So without thinking to much I drilled the four holes in the overhead channel. Again I used the accordian drilling jig.

Then I went to drill the angle and decided I DON"T KNOW WHERE THIS GOES. Not the general position, but rather I don't know exactly how it will fit or its exact location unless I assemble these parts. So before I rivet the forward and aft set of channels together, I'll assemble these parts and locate this upper channel and get those little angles positioned, drilled and riveted to the aft channel.
' style=

Four holes in the overhead channel

Four holes in the overhead channel

' style=

What is the lateral position?

What is the lateral position?

' style=

I'll assemble all this to determine location

I'll assemble all this to determine location

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.